The Long EZ

Welcome to my airplane build blog! I am in the process of building a Long-EZ aircraft. The Long-EZ is a 2-place, single-engine, all-composite airplane. Unlike most airplane designs, the Long-EZ is a canard-pusher, meaning it has the stabilizer and elevator in the front, and the engine located in the back. Feel free to browse around and contact me with any comments, questions and/or motivational anecdotes - thelongezbuild at gmail dot com.

Follow me on:
YouTube
Facebook


Chapter 1 - General information
     1. The Long-EZ
     2. Composite basics
     3. Tooling
     4. Time and budget tracking

Chapter 2 - Materials
     1. List of materials

Chapter 3 - Practice layups
     1. The flat layup
     2. The load beam
     3. The bookend

Chapter 4 - Bulkheads
     1. Overview
     2. Front seat
     3. Rear seat
     4. F28 bulkhead
     5. Instrument panel
     6. F22 and doubler
     7. The firewall




Chapter 5 - Fuselage sides 
     1. Overview
     2. Fuselage side walls - prep
     3. Fuselage sides - left inside glassing
     4. Fuselage sides - right inside glassing
     5. Top longeron reinforcement and trim
     6. Aft fuselage beef-up 




Chapter 6 - Fuselage assembly 
     1. Overview
     2. Rigging and floxing the fuselage
     3. Applying BID tape to bulkheads
     4. Straightening out the fuselage
     5. Contouring the fuselage floor
     6. Glassing and bonding the fuselage floor
     7. Applying BID tape to bottom corners
     8. F28 and doubler installation
     



Chapter 7 - Fuselage exterior
     1. Overview
     2. Rounding the corners
     3. Making and installing the main landing gear attach brackets
     4. Trimming the F22 bulkhead 'batman' ears
     5. Seat belt hard points
     6. Flex hose conduit inserts
     7. Glassing the exterior fuselage




Chapter 8 - Rollover structure & seat belts
     1. Overview
     2. Rollbar  
     ::postponed this chapter for now::


Chapter 9 - Part 1: Speed brake
     1. Overview
     2. Speed brake recess
     3. Speed brake glassing (outside)
     4. Speed brake glassing (inside) 
     5. Speed brake actuator




Chapter 9 - Part 2: Main landing gear
     1. Overview
     2. Outside strut layup
     3. Positioning the main gear strut on the fuselage   
     4. Gear attachment fitting layup (the gear tabs)
     5. Finishing up the tab/LMGA assembly
     6. Installing the axles
     7. Installing the brakes and wheels
     8. Packing the wheel bearings




Chapter 10 - Canard
     1. Overview
     2. Inner cores and shear web layup
     3. Installing the lift tabs and leading edge
     4. Canard jig and bonding extension tips
     5. Bottom spar cap and skin
     6. Prep for the top skin glassing and hinge inserts
     7. Top spar cap and skin  




Chapter 13 - Nose and nose gear
     1.    Overview
     2.    Extended round nose
     3.    Nose wheel strut
     4.    NG30 panels
     5.    Nose gear box installation
     6.    Nose bulkheads
     7.    NG6 pivot to nose strut
     8.    F1-3 installation
     9.    Nose floor pans
     10.  Rudder pedal assemblies
     11.  Nose wheel casting installation
     12.  NG3/NG4 and actuator hook-up
     13.  Nose side panels
     14.  Rudder pedal installation    
     15.  Making the strut cover
     16.  F4.1 and forward nose strut ramp
     17.  Installing the SC strut cover and NB wheel cover
     18.  Forward nose assembly and bottom nose glass




Chapter 14 - Center-section spar
     1.   Overview
     2.   Building the spar jig
     3.   Bonding the spar foam panels
     4.   Spar interior layup
     5.   Spar lid (CS4)
     6.   Troughs and shear web
     7.   Top spar cap
     8.   Bottom spar cap     
     9.   Outside layup
     10. Forward face layup and end caps  




Chapter 19 - Wing, ailerons and wing attach  
     1.   Overview
     2.   Right wing foam cores
     3.   Inboard shell and wing attach pockets
     4.   Wing jigs and FC sections
     5.   Shear web layup
     6.   Leading edge and bottom spar cap
     7.   Bottom wing skin layup
     8.   Top wing spar cap
     9.   Top wing skin layup  ::coming soon!!::



 ::last updated on November 19, 2015:: 


Still to come:

Chapter 11 - Elevators
Chapter 12 - Canard installation

Chapter 15 - Firewall and accessories
Chapter 16 - Control system
Chapter 17 - Roll/pitch trim system
Chapter 18 - Canopy

Chapter 20 - Winglet and rudders
Chapter 21 - Strakes and fuel tanks
Chapter 22 - Electrical system
Chapter 23 - Engine install
Chapter 24 - Covers, fairings and consoles
Chapter 25 - Paint and finishing
Chapter 26 - Upholstery